Orange Building, Media City, Salford

This scheme involved the fit out of three floors of the Orange building for SIS. This facility handles, amongst other things, all transmissions from Racecourses across the UK to a private network.

The scheme involved the design of production control rooms and editing suites on one floor. These areas were connected to a central data hub.

These areas had special acoustic requirements with one particular challenge being breach in noise from adjacent plant and equipment. The office area included fully glazed pods. ECS designed free standing bollards for switching these areas. The project was delivered on time and within budget allowing a gradual migration of staff to this new facility.

ECS logo
Project Overview New Production Control Rooms and Offices
Key Aspects Fire Suppression System
Overall project value £1,500,000
Client SIS

Latest News

ECS are looking for their next Building Services Design Engineer Apprentices

25 May 2023

Read Article

Going Green with Xplore! Science Discovery Centre

08 Feb 2023

Read Article

ECS Consultants Christmas ‘Guess Who?’

09 Dec 2022

Read Article

ECS Welcomes James Clarkson to the Team!

25 Apr 2022

Read Article

©2023 ECS Consultants | Website by Obi