True BIM level II compliance requires the use of a single building model for thermal performance modelling, design calculation inputs, and CAD / REVIT drafting. The adoption of BIM and REVIT helps ensure that clash detection is achieved as soon as possible, so that potential issues are not transferred to site during the construction process.