TV & the Arts
Throughout the design phase, ECS liaised with representatives from the BBC to determine the technical wiring specification. The studio was fully air conditioned and met the specific acoustic criteria set down by the BBC.
The studio installation was carried out by ECS as part of the overall project, with works undertaken by the project Mechanical and Electrical Contractors and specialist Sub-Contractors.
Project Overview | Building extension including a broadcast quality radio studio |
Key Aspects | Air Source Heat Pump |
Overall project value | £1,000,000 |
Client | Eurythmic |