bars
envelope1 twitter linkedin

Commercial Project

Delta House, Manchester

This project involved the establishment of a new data mall to handle increased system capacity.

ECS carried out the re-design of the existing infrastructure, specifying eight new UPS units and a new generation control panel,,with an additional generator connection and the fitting of an upgraded distribution system.

The new data centre now also benefits from close control cooling plant and gas discharge system.

ECS logo
Project Overview Data Centre development
Key Aspects UPS and standby generator
Overall project value £350,000
Client Client Team

ECS dealt directly with the client in relation to a complex logistics programming that allowed the existing data centre to operate normally, with no business interruption or reduction in capacity.

The entire project was undertaken in an ordered manner with close project management provided by ECS Consultants. This level of support enabled the client to grow in confidence as the various business critical switching operations were undertaken.

Latest News

ISO Success for ECS

12 Aug 2024

Read Article

The Future’s Bright!!

19 Jul 2024

Read Article

Business Fives

16 Feb 2024

Read Article

ECS Team Attends ASHRAE Winter Conference

02 Feb 2024

Read Article

©2024 ECS Consultants | Website by Obi