This new, two form entry primary school resulted from the amalgamation of a pair of existing establishments and was constructed on an undeveloped brown field site.

ECS obtained all search information and organised the diversion of all utilities for the site. This also involved the application for new supplies for the proposed school building.

The project was targeted at BREEAM ‘Very Good’ and ECS dealt with the BREEAM Assessor in relation to the energy requirements. The building was heated using a ground source heat pump with an underfloor heating system in order to maximise efficiency.

This system was complemented by gas boiler plant. The gas plant provided a top up for the underfloor heating and domestic hot water generation.

ECS designed mechanical ventilation systems to meet the requirements of Building Bulletin 101. The specified lighting system was biodynamic, allowing lamp colour temperature to change throughout the day.

ECS logo
Project Overview Construction of a two form entry primary school
Key Aspects Ground source heat pump
Overall project value £6,500,000
Client Salford Diocese

Latest News

Back to School

15 Jun 2020

Read Article

Community Hub project underway

11 Feb 2020

Read Article

FUSION 21 Framework for ECS

05 Feb 2020

Read Article

Time for TT?

15 Jan 2020

Read Article

©2020 ECS Consultants | Website by Obi