Industrial Project
ECS carried out the engineering design to modify the network and establish a new sub-station, supplying the distribution centre exclusively.
The building was fully sprinklered, complete with a full standby generator set and 10 metre diameter external sprinkler tank. ECS designed the fire suppression system to Loss Prevention Council standards, incorporating in-rack sprinklers.
Project Overview | New warehouse and distribution centre. |
Key Aspects | Fire suppression and lighting controls |
Overall project value | £10,000,000 |
Client | Bower Mattin |
ECS consulted directly with the client in relation to the design of the IT infrastructure for the central stock management system, which utilises transmitted units linked to the data network, with receiver units mounted on the fork lift trucks.
ECS also coordinated the design of the truck guidance system, operated in conjunction with the aisle design and interfaced with the energy-saving lighting control system.