bars
envelope1 twitter linkedin

TV & the Arts

Television Centre, Leeds

This project involved the conversion of scene docks areas into studio facilities in order to enable the relocation of the popular ITV serial drama “Emmerdale”.

The scheme included the design of audio and visual control rooms, dimmer rooms and data storage facilities for the new digital recording television studios. ECS designed the cooling systems within the television studios, including all associated acoustic requirements, and developed mechanical ventilation systems with the appropriate acoustic treatments

During the design, ECS liaised closely with ITV production and set designers regarding studio lighting arrangements and the specification of dimmer equipment, which was linked to the visual control rooms.

ECS logo
Project Overview New studio facilities
Key Aspects Technical power and media wiring
Overall project value £5,000,000
Client ITV

ECS also liaised closely with specialist suppliers regarding fit-out television wiring systems. These state-of-the-art studio facilities were delivered on time, resulting in a seamless changeover with no loss of production.

Latest News

2024 Building Services Design Engineer Apprentices

04 Apr 2025

Read Article

ECS ARE LOOKING FOR THEIR NEXT BUILDING SERVICES DESIGN ENGINEER APPRENTICES 2025

01 Apr 2025

Read Article

ECS Engineers visit ASHRAE Winter Conference, Orlando

27 Mar 2025

Read Article

ECS Apprentice Engineers visit Hong Kong

Read Article

©2025 ECS Consultants | Website by Obi