bars
envelope1 twitter linkedin

TV & the Arts

Orange Building, Media City, Salford

This scheme involved the fit out of three floors of the Orange building for SIS. This facility handles, amongst other things, all transmissions from Racecourses across the UK to a private network.

The scheme involved the design of production control rooms and editing suites on one floor. These areas were connected to a central data hub.

These areas had special acoustic requirements with one particular challenge being breach in noise from adjacent plant and equipment. The office area included fully glazed pods. ECS designed free standing bollards for switching these areas. The project was delivered on time and within budget allowing a gradual migration of staff to this new facility.

ECS logo
Project Overview New Production Control Rooms and Offices
Key Aspects Fire Suppression System
Overall project value £1,500,000
Client SIS

Latest News

Happy Christmas and Happy New Year

19 Nov 2024

Read Article

ISO Success for ECS

12 Aug 2024

Read Article

The Future’s Bright!!

19 Jul 2024

Read Article

Business Fives

16 Feb 2024

Read Article

©2024 ECS Consultants | Website by Obi